How Tangled Is the Old System? Interface Effort Estimator

Score the connections between your legacy application and everything around it, as one input to planning how, and in what order, to migrate.

The Old System and Its Connections

System Characteristics

Technical Factors

Compliance & Security

Organisational Factors

Integration Complexity Score
0
Select options to calculate
Configure your integration project details above to see the complexity assessment.
Simple (0-25) Moderate (26-50) Complex (51-75) Very Complex (76-100)

Effort Estimation

Estimated Duration
-
weeks
Team Size
-
engineers
Effort
-
person-weeks
Risk Level
-
-

Complexity Breakdown

Factor Selection Score
Configure options to see breakdown

Risk Factors

Configure options to see risk assessment

Recommendations

Project Approach

Configure your integration project details above to receive tailored recommendations.

Score Bands (indicative labels set by this tool)

Complexity Level Score Range Indicative Duration (tool assumption) Characteristics
Simple 0-25 2-6 weeks 2-3 systems, standard APIs, good documentation
Moderate 26-50 6-16 weeks 3-5 systems, some custom work, partial documentation
Complex 51-75 16-32 weeks 5+ systems, legacy systems, compliance requirements
Very Complex 76-100 32+ weeks Many systems, real-time, multiple compliance, poor documentation

Why interfaces drive migration effort

When an organisation plans to replace an ageing application, attention goes first to the screens people use. The harder work usually sits out of sight: the nightly file sent to the bank, the export a manager pulls into a spreadsheet each Monday, the stock feed to the website, the link to payroll. Every one of these has to be found, kept working while old and new run side by side, and then moved or retired. This estimator turns a description of those connections into a rough score, so you can see early whether the migration is a modest job or a programme that needs staging and dedicated integration work.

The scoring weights are fixed rules written into this page, and the duration and team-size figures it shows are indicative outputs of those rules, not measurements from real projects. Use the score to compare options and to prompt questions, not as an estimate to quote.

Reading the inputs as a modernisation planner

Decision point: what the score should change

Score bandWhat it suggests for the roadmap
LowA direct replacement with a single cut-over may be reasonable, provided data sign-off is planned.
ModeratePlan a short parallel run and list each interface with an owner and a test.
HighFavour a phased migration; budget for an integration layer that both systems can use during transition.
Very highConsider rehosting first to stabilise, then untangle interfaces one by one before replacing functions.

Run the estimator twice: once for the current estate and once for the target picture after migration. If the target score is not clearly lower, the new design may be recreating the same tangle on newer technology. For timelines, take the interface count into the migration phase planner, and for a wider view of the planning tools see the stage-by-stage tools guide.