Keeping a Team Going Through a Long Modernisation Programme
Replacing a core system is rarely a sprint. For a small or mid-sized organisation it can run for a year or more, during which the same people keep the old system alive, help build the new one, test it, train colleagues and still do their day jobs. Enthusiasm at the kick-off does not last that long on its own. Programmes that finish well tend to treat team energy as a resource to be planned, not an assumption.
Where fatigue comes from
- Double duty. Key users are seconded part-time but their usual workload is not reduced.
- The long middle. After the excitement of selection and before the satisfaction of go-live, months of testing and data cleaning feel like no progress.
- Running two systems. Parallel running doubles some tasks and creates confusion about which system to use.
- Shifting dates. Each delay, even a justified one, chips away at belief that the end is real.
- Invisible contributors. The person maintaining the old system gets little credit while attention goes to the new one.
Practical ways to sustain the team
Backfill properly
If someone is expected to spend two days a week on the programme, arrange cover for two days of their usual work. Temporary staff, rescheduled deadlines or reduced targets are all options. Without backfill, the programme silently competes with the day job and usually loses.
Make progress visible
Short phases with real endings help. So does a simple visual tracker of functions moved, interfaces retired or users trained. In the long middle, celebrating small completions matters more than it sounds.
Recognise the old-system keepers
The people supporting the legacy system are taking on a job with no future glory. Thank them publicly, involve them in testing the new system and make sure they have a role afterwards. Losing them before switch-off can be disastrous.
Plan rest around peaks
Cut-over weekends, year-end and audit periods are intense. Avoid stacking them, and give people recovery time after a major switch rather than moving straight on to the next phase.
Signals to watch
Rising sick leave, short-tempered meetings, missed testing sessions and a drop in reported issues (people stop bothering) are all signs that the team is running low. Sponsors who check in informally with key users, rather than relying only on status reports, tend to spot these early. When they appear, the right response may be to slow down. A programme that pauses for a month to recover loses less than one that pushes on and loses its best people.
Sources and further reading
- Matthew Skelton and Manuel Pais — Team Topologies (IT Revolution, 2019).
- John P. Kotter — Leading Change (Harvard Business Review Press, 1996).
- Jeffrey M. Hiatt — ADKAR: A Model for Change in Business, Government and Our Community (Prosci, 2006).