When the Old and New Systems Disagree: Choosing a System of Record for Each Phase
Halfway through a phased replacement, a customer rings to query an invoice. The new system shows one balance; the old one shows another. Which is right? If nobody can answer that in seconds, the programme has a governance gap rather than a technical one. Every type of business record needs a single, agreed “system of record” at each stage of the transition, and staff need to know which it is.
Why disagreement is normal
While two systems run side by side, they are fed by different people, at different times, with different rules. Some differences are expected, such as a nightly copy that has not yet run. Others reveal real problems, such as a pricing rule that the new system applies differently. The danger is not the disagreement itself but treating both systems as equally authoritative, which leads staff to pick whichever answer suits them.
Deciding the system of record
Work through each record type the old system holds and assign an owner and a source for every phase. A short table, kept up to date and visible to all staff, does the job.
| Record type | Phase 1 | Phase 2 | Phase 3 | Business owner |
|---|---|---|---|---|
| Customers | Old | New | New | Sales manager |
| Price lists | Old | Old | New | Commercial lead |
| Orders | Old | New for new orders; old for open orders | New | Operations lead |
| Invoices | Old | Old | New | Finance lead |
The example is illustrative; the point is the structure. Each cell is a decision someone has signed off, and each change of cell is a planned event with communication to staff.
Rules that keep it workable
- Edit in one place only. A record type should be changed only in its system of record. If the other system needs it, it gets a copy.
- Make the copy look like a copy. Where possible, show read-only screens or a banner so people do not edit the wrong version.
- Name a referee. When figures disagree, one person per record type decides which is correct and logs why. Patterns in that log show where the transition logic needs fixing.
- Tell external parties. Customers and suppliers who receive documents should get them from one system per phase, not both.
The people side
Staff often trust the old system more because they know its quirks. During early phases that instinct is useful; they will spot errors in the new system quickly. Later it becomes a brake, as people keep checking the old screens long after the switch. Announce each change of system of record clearly, explain why, and once a record type has moved, remove edit access to the old version. Leaving it available “just in case” tends to prolong the period of confusion.
For more on the different shapes coexistence can take, the diagrams of old and new systems side by side elsewhere on this site may help. If you have a question about your own transition, the contact page is the place to send it.
Sources and further reading
- Sam Newman — Monolith to Microservices (O’Reilly, 2019).
- Gregor Hohpe and Bobby Woolf — Enterprise Integration Patterns (Addison-Wesley, 2003).